Construction of the Anne Arundel Hall building is progressing nicely. Foundations are complete and contractors are presently constructing the concrete and masonry walls and floors that make up the building structures. The first floor walls are complete and the second floor decks and walls are in progress. Soon we will see the steel roof structure being erected.
Archives for July 2015
The Anne Arundel Hall Construction Project is Well Underway
The Anne Arundel Hall Construction Project consists of three separate buildings connected by bridges at the second floor level. The underground infrastructure is in place. This infrastructure includes telephone and data duct banks, electrical duct banks, domestic water distribution mains, and sanitary sewer and storm water management piping. Also in place are the building foundations. The foundations are made up of augured grout piles and pile caps or grade beams. The first floor concrete slabs are in place for the north and south buildings as well as the concrete slab for the west building. Masonry walls are up to the second floor deck level on both the north and south buildings.